Energi Teknikk has signed a contract with hywer for electromechanical supply to Øvre- and Nedre Foldvik hydro power plant. The power plants is located in Gratangen in Troms, Norway. The power plants will be equipped with one ET Pelton turbine with an output of 2,14 MW and one ET Brekke Pelton turbine with an output of 5 MW. The power plants will be put in operation in Q1-25.