Energi Teknikk has signed a contract with Blåfall for electromechanical supply to Trongstadlia HPP. The power plant is located in Åfjord municipality in Trøndelag county, Norway. The power plant will have a combined output of 5 MW, and will be equipped with two ET Francis turbines, ET AutoTurbin control system, and necessary auxiliary systems. The power plant is to be put in operation in Q3 2025.