Energi Teknikk has signed a contract with Cadre for electromechanical supply to Jotind HPP. The power plant is located in Tjeldsund municipality in Troms county, Norway. The power plant will have a total output of 8,5 MW, and will be equipped with one ET Brekke Pelton turbine, one ET Pelton turbine, ET AutoTurbin control systems, and necessary auxiliary systems. The power plant is to be put in operation in 2026.