Energi Teknikk has signed a contract with Cadre for electromechanical supply to Skjersfossane HPP. The power plant is located in Birkenes municipality in Agder county, Norway. The power plant will have an output of 2,1 MW, and will be equipped with WWS Wasserkraft Kaplan turbine, ET AutoTurbin control system, and necessary auxiliary systems. The power plant is to be put in operation in Q2 2025.