Energi Teknikk has signed a contract with Cadre Elvekraft for electromechanical supply to Nylandselva HPP. The power plant is located in Leirfjord municipality in Nordland county, Norway. The power plant will have a turbine power of 2771 kW, and will be equipped with ET Pelton turbine, ET AutoTurbin control system, and necessary auxiliary systems. The power plant is to be put in operation in Q2 2026.