Energi Teknikk delivers to Elde hpp

Energi Teknikk has signed a contract for electromechanical supply to Elde power plant located in Vestland in Norway. The powerplant will have an output of 1,4 MW with a head of 104 meters. The turbine type is a vertical ET Pelton turbine. The powerplant will be put in operation in Q3 2021.