Energi Teknikk has signed a contract with Hywer for electromechanical supply to Somrungen hydro power plant. The power plant is located in Sunndal in Møre og Romsdal, Norway. The power plant will have an output of 3,75 MW and will be equipped with ET Brekke Pelton turbine. The power plant will be put in operation in Q4-24.