Delivery for Rullestadpakken, 3 HPPs!

Energi Teknikk has signed a contract with Kraftpartnar for electromechanical supply to Rullestadpakken, which is 3 hydropower plants, Skromme, Bordalen 2, and Kvernhuselva. The power plants are located in Etne municipality in Rogaland county, Norway. The power plants will have a combined output of 28,6 MW from 5 turbines, two ET Brekke Pelton turbines which together are 21,7 MW, two ET Francis turbines which together are 3,7 MW, and one ET Pelton turbine which is 3,22 MW. All plants also equipped with AutoTurbin control systems, and necessary auxiliary systems. The power plants are scheduled to be put in operation in Q4 2025.