Energi Teknikk has signed a contract with Kraftpartnar for electromechanical supply to Vassbakke HPP. The power plant is located in Volda municipality in Møre og Romsdal county, Norway. The power plant will have an output of 1,2 MW, and will be equipped with ET Pelton turbine, ET AutoTurbin control system, and necessary auxiliary systems. The power plant is to be put in operation in Q3 2026.