Energi Teknikk has signed a contract with Vesterålskraft for electromechanical supply to Tverrelva hydro power plant. The power plant is located in Kvæfjord in Troms, Norway. The power plant will have an output of 3,2 MW and will be equipped with ET Pelton turbine. The power plant will be put in operation in Q3-24.