Energi Teknikk has signed a contract with Sunnhordland Kraftlag AS for electromechanical supply to Onarheim HPP. The power plant is located in Kvinnherad municipality in Vestland county, Norway. The power plant will have a turbine power of 8834 kW, and will be equipped with ET Brekke Pelton turbine, ET AutoTurbin control system, and necessary auxiliary systems. The power plant is to be put in operation in Q4 2026.