Delivery for Vesla HPP!

Energi Teknikk has signed a contract with Vesla Kraft AS for electromechanical supply to Vesla HPP. The power plant is located in Tinn municipality in Telemark county, Norway. The power plant will have an output of 3,46 MW, and will be equipped with ET Pelton turbine, ET AutoTurbin control system, and necessary auxiliary systems. The power plant is planned put in operation in Q2 2026.