Delivery for Kråkeelvi HPP!

Energi Teknikk has signed a contract with Sognekraft for electromechanical supply to Kråkeelvi HPP. The power plant is located in Høyanger municipality in Vestland county, Norway. The power plant will have an output of 5,2 MW, and will be equipped with ET Brekke Pelton turbine, ET AutoTurbin control system, and necessary auxiliary systems. The power plant is to be put in operation in Q2 2026.