Energi Teknikk has signed a contract with Tussa Kraft for electromechanical supply to Nesset, Skår og Røyrhus HPPs. The power plants are located in Møre og Romsdal county, Norway. The power plants will have a combined output of 3,7 MW, and will be equipped with one ET Francis turbine, two ET Pelton turbines, ET AutoTurbin control system, and necessary auxiliary systems.