The power plants is located in Fjærland, Vestland in Norway.
The power plants will have an output of 4,3 MW and will be equipped with ET Pelton turbine. The power plant will be put in operation in Q3-22.[:]
The power plants is located in Fjærland, Vestland in Norway.
The power plants will have an output of 4,3 MW and will be equipped with ET Pelton turbine. The power plant will be put in operation in Q3-22.[:]